5G Technology World

  • 5G Technology and Engineering
  • FAQs
  • Apps
  • Devices
  • IoT
  • RF
  • Radar
  • Wireless Design
  • Learn
    • 5G Videos
    • Ebooks
    • EE Training Days
    • FAQs
    • Learning Center
    • Tech Toolboxes
    • Webinars/Digital Events
  • Handbooks
    • 2024
    • 2023
    • 2022
    • 2021
  • Resources
    • Design Guide Library
    • EE World Digital Issues
    • Engineering Diversity & Inclusion
    • Engineering Training Days
    • LEAP Awards
  • Advertise
  • Subscribe

Aeroflex Receives License to Provide Test Systems for Automated Testing of Mobile Devices

By Staff Author | April 19, 2012

Aeroflex Limited announced that it has signed a licensing agreement with Qualcomm Incorporated to supply manufacturing test technology for RF devices. “This agreement enables Aeroflex to deliver test cost reductions to Qualcomm customers,” said Tim Carey, product manager for Aeroflex Limited. “The Aeroflex PXI 3000 modular RF test communications platform is ideally suited to further reduce test cycle times.” This worldwide commercial Factory Test Technology License gives Aeroflex the ability to provide Qualcomm customers with efficient automated manufacturing test solutions.  Aeroflex will be able to validate its test solution against Qualcomm cellular mobile devices and provide data to Qualcomm’s customers.  Additionally, Aeroflex will have access to software tools and technical support direct from Qualcomm.


www.aeroflex.com  


 


Posted by Janine E. Mooney, Editor


 


April 19, 2012


Filed Under: RF

 

Next Article

← Previous Article
Next Article →

Related Articles Read More >

Open RAN test service adds colocation capabilities
Switch operates DC to 20 GHz with 128 configurable connection states for asymmetric SerDes testing
Butler Matrix
Butler Matrix drives Wi-Fi and other phased-array antennas
Long-wire dipole antennas: still viable after more than a century

Featured Contributions

  • Overcome Open RAN test and certification challenges
  • Wireless engineers need AI to build networks
  • Why AI chips need PCIe 7.0 IP interconnects
  • circuit board timing How timing and synchronization improve 5G spectrum efficiency
  • Wi-Fi 7 and 5G for FWA need testing
More Featured Contributions

EE TECH TOOLBOX

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

EE LEARNING CENTER

EE Learning Center
“5g
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.

Engineering Training Days

engineering
“bills
5G Technology World
  • Enews Signup
  • EE World Online
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Microcontroller Tips
  • Analogic Tips
  • Connector Tips
  • Engineer’s Garage
  • EV Engineering
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • About Us
  • Contact Us
  • Advertise

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy

Search 5G Technology World