5G Technology World

  • 5G Technology and Engineering
  • FAQs
  • Apps
  • Devices
  • IoT
  • RF
  • Radar
  • Wireless Design
  • Learn
    • 5G Videos
    • Ebooks
    • EE Training Days
    • FAQs
    • Learning Center
    • Tech Toolboxes
    • Webinars/Digital Events
  • Handbooks
    • 2024
    • 2023
    • 2022
    • 2021
  • Resources
    • Design Guide Library
    • EE World Digital Issues
    • Engineering Diversity & Inclusion
    • Engineering Training Days
    • LEAP Awards
  • Advertise
  • Subscribe

RF Termination to 1GHz for Base station, Broadcast, Radar Applications

By Barry Industries | November 19, 2015

Barry Industries announces the introduction of a RoHS compliant flange mount RF termination, T50R0-1750-1X, which dissipates 1750W with favorable return loss over a DC to 1GHz bandwidth. Barry Industries is an ISO9001:2008 certified, ITAR registered manufacturer of high quality thick film resistors, terminations, attenuators and high temperature co-fired ceramic (HTCC) packaging.

The thick film on Beryllium Oxide (BeO) T50R0-1750-1X termination, with its internally matched circuit architecture, exhibits 20dB or better return loss from DC to 1GHz.

The flange and input tabs are constructed of robust Silver plated Copper. The overall footprint is 2.25” x 1.25” (57.15mm x 31.75mm).

With its 1750W power rating, low VSWR and stable 50Ω resistor element, the T50R0-1750-1X is ideal for critical applications including Mobile Radio Base station, Broadcast and Phased-Array Radar.

Additionally, Barry offers many other high power flange mount terminations with power ratings from 10W to 5000W in many different configurations.


Filed Under: Radar

 

Next Article

← Previous Article
Next Article →

Related Articles Read More >

Butler Matrix
Butler Matrix drives Wi-Fi and other phased-array antennas
FAQ on the Butler matrix for beamforming: part 1
IEEE Phased Array 2024: what we saw
Harrison Osbourn, CEO Signal Hound
New Signal Hound CEO to focus on strategy, marketing, sales

Featured Contributions

  • Overcome Open RAN test and certification challenges
  • Wireless engineers need AI to build networks
  • Why AI chips need PCIe 7.0 IP interconnects
  • circuit board timing How timing and synchronization improve 5G spectrum efficiency
  • Wi-Fi 7 and 5G for FWA need testing
More Featured Contributions

EE TECH TOOLBOX

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

EE LEARNING CENTER

EE Learning Center
“5g
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.

Engineering Training Days

engineering
“bills
5G Technology World
  • Enews Signup
  • EE World Online
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Microcontroller Tips
  • Analogic Tips
  • Connector Tips
  • Engineer’s Garage
  • EV Engineering
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • About Us
  • Contact Us
  • Advertise

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy

Search 5G Technology World